TRANSFORMER ENERGISATION

Transformer inrush current mitigation

When energised, a transformer may draw high magnetising current, causing voltage dips or protection operation. Solutions need to be assessed for the particular transformer and supply conditions.

A different phenomenon from motor starting

Energisation current also depends on residual flux, switching instant and core saturation. The solution requires devices suited to the transformer and its switching conditions.

Technologies to compare

Options include controlled switching, pre-magnetisation and temporary impedance insertion followed by bypass. Availability and suitability depend on transformer rating, voltage and configuration.

Protection and repeatability

Inrush peak and duration, voltage dip, switching frequency, re-energisation conditions and protection coordination are checked. Systems for small LV transformers cannot automatically be extended to distribution transformers.

How Studio PQM helps

Measurement of energisation behaviour, circuit review and comparison of transformer-specific solutions with suppliers, including definition of verification conditions.

Compare ranges and features · 2 configurations

General guidance by solution type, using a 400 V low-voltage supply as reference. Ranges summarise the ratings considered and do not imply that all combinations are available. Connection, rating and actual performance must be checked for the project.

Controlled LV transformer energisation
ConfigurationRatings and supplyFeaturesChecks required
Single-phase energisation16–32 A; reference supply 400 V, connection to be checkedEnergisation control and bypass defined for the projectCore, residual flux and thermal conditions
Three-phase energisation32–50 A; 400 V supplyEnergisation control and bypass defined for the projectConnections, protection and re-energisation

Currents are switching-device ratings; derating and switching conditions apply. These configurations do not describe a range for MV/LV distribution transformers.